Belgian dredging firm Deme has received a contract price €52m to assist construct an offshore wind terminal within the Port of Cuxhaven in Germany.
Anticipated to price €300m in complete, the terminal is being developed by a consortium that additionally consists of two German corporations: marine engineer Tagu and common contractor Depenbrock.
It can enhance Cuxhaven’s skill to deal with heavy-duty masses, significantly parts for wind farms.
Will probably be operated by Niedersachsen Ports (NPorts), and can include berths and 1,250m of quay, in addition to a storage space of 38ha.
Deme will perform dredging and land reclamation works. Lutz Dröge, space supervisor for Germany, mentioned in a press assertion: “Building of the expanded terminal requires an revolutionary technical strategy.
“The challenge consists of the set up of combi-walls and land reclamation in a dynamic estuarine setting, assembly the advanced engineering necessities tailor-made to a heavy load terminal and demanding geotechnical situations.”
The corporate is anticipated to make use of two suction hopper dredgers and a backhoe dredger to reposition greater than 3 million cubic metres of mud.
It was introduced in March that finance for the challenge can be offered by the federal authorities along with the state of Decrease Saxony and personal business.
Deme and its consortium companions beforehand delivered berths 8 and 4 on the identical port. Moreover, Deme used Cuxhaven as its base throughout work on the Borkum Riffgrund 2 offshore wind farm.
Prior to now, the corporate has additionally labored on deepening of the Elbe River, which flows into the North Sea at Cuxhaven, and the widening of the Kiel Canal.
This challenge will begin early subsequent yr and full in the course of 2028.
- Subscribe right here to get tales about building around the globe in your inbox 3 times per week