Skip to content
PMMilestone :: Project Management and Engineering Blog
Menu
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
Menu
construction

Icelandic exhibit to explore the use of (cooled) lava in sustainable building

Posted on November 1, 2024




A 2014 volcanic eruption in Iceland (Gisli Baldursson/Dreamstime)

Iceland’s pavilion at subsequent 12 months’s Venice Bienniale is to showcase a “Lavaforming” exhibit. This will likely be designed by Arnhildur Pálmadóttir of S.AP architects, and can exhibit how managed lava flows can create sustainable buildings.

The exhibition will spotlight the Grenjaðarstaður turf home (pictured beneath), a Nineteenth-century vicarage that’s primarily insulated with lava.

The mission is impressed by Iceland’s location on a rift between two tectonic plates. These are shifting aside and the hole between is continually being crammed by molten rock.

The Grenjaðarstaður turf home which makes use of lava rocks as insulation (The Nationwide Museum of Iceland)

Pálmadóttir commented: “In our story, positioned in 2150, we now have harnessed the lava move, simply as we did with geothermal power 200 years earlier in Iceland.

“The principle objective of Lavaforming is to point out that structure will be the drive that rethinks and shapes a brand new future with sustainability, innovation and artistic considering. The theme is each a proposal and a metaphor – structure is in a paradigm shift, and plenty of of our present strategies have been deemed out of date or dangerous in the long run.”

The biennale will run from the ten Might to 23 November.



Source link

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Facebook
  • Facebook
  • X
  • LinkedIn
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
  • Terms of Service
  • Privacy Policy
  • Why Every Software Product Is A Ticking Time Bomb
  • Yale pauses 10 projects as funding worries grow
  • Process, Tools and Best Practices
  • H&M (HMB) earnings, Q2 FY25
  • Webuild team hits milestones on massive Genoa breakwater

This page has been viewed 0 times.

©2025 PMMilestone :: Project Management and Engineering Blog | Design: Newspaperly WordPress Theme