Turner Development has reached a brand new altitude on its $260 million growth of C Concourse at Seattle-Tacoma Worldwide Airport.
The New York Metropolis-based contractor topped out the metal on the 226,000-square-foot construction, finishing vertical development, in accordance with a Dec. 20 information launch.
The six-story renovation venture will add 4 ranges to the prevailing constructing to offer enhancements for passengers. The higher flooring will introduce expanded eating and retail choices, extra seating and a 1,300-square-foot extension to the passenger ready space, the contractor mentioned in its launch.
Key options embody a rooftop photovoltaic array, a meditation room, a nursing room and two airfield statement decks.
Initially focusing on LEED Silver certification, the venture is on monitor to realize LEED Gold, Turner mentioned, attributable to its progressive integration of energy-efficient techniques and sustainable components.
“This venture exemplifies how we are able to assemble important infrastructure that advantages each vacationers and the surroundings,” mentioned Invoice Ketcham, vp and normal supervisor at Turner, within the launch.
The venture is scheduled for substantial completion in 2026.