Gravel Calculator
This gravel calculator converts length, width and depth into bulk material volume and estimated delivery weight. Choose gravel, crushed stone, sand or topsoil, then read cubic metres, cubic yards, metric tonnes and US short tons together.
By Dr. Hassan Khames EliwaLast updated
Result
- Volume (yd³)
- 2.62 yd³
- US short tons
- 3.53 US tons
- Bulk density usedLoose bulk estimate; confirm moisture, compaction and density with your supplier.
- 1,600 kg/m³
How it works
Measure a consistent bed depth
For metric inputs, enter length and width in metres and depth in centimetres. For imperial inputs, enter length and width in feet and depth in inches. Depth is deliberately a smaller unit because shallow aggregate layers are easier to specify that way. Measure several locations if the underlying surface slopes or has hollows.
The calculation describes a rectangular prism. For a tapered path, split it into shorter sections or calculate an equivalent average width. For a circular bed, first use the square footage calculator to establish area, then choose dimensions whose product matches that area. Using diameter as both length and width describes a square, not a circle.
Convert volume into delivery weight
The foot, yard and US-pound-based mass conversions follow exact international conversion definitions. The density assumptions do not have that same certainty. Loose bulk density includes voids between particles and changes with grading, moisture and how material is handled.
Understand the density presets
Gravel and sand use 1,600 kg/m³, crushed stone uses 1,700 kg/m³, and topsoil uses 1,200 kg/m³. These are approximate planning presets, not certified properties of a named supplier’s product. Enter a supplier density override in kg/m³ when available, whichever measurement system you selected.
No compaction, settlement or ordering allowance is included. If your specified layer is a finished compacted depth, ask the supplier how much loose material is needed to achieve it. Applying a guessed compaction percentage can be less reliable than using the supplier’s stated yield for the exact aggregate.
Worked example
A small gravel standing area
Select metric, gravel, length 5 m, width 4 m and depth 10 cm. Leave the supplier density override blank. Volume is 5 × 4 × 0.10 = 2.00 m³, displayed alongside 2.62 yd³.
At the preset density of 1,600 kg/m³, estimated mass is 3,200 kg. The results show 3.20 metric tonnes and 3.53 US short tons. These are two units for the same mass, not two separate suggested delivery quantities.
If the supplier confirms 1,500 kg/m³ for its loose product, enter that override. Volume remains 2.00 m³ while mass becomes 3.00 metric tonnes, or 3.31 US short tons. Obtain a delivery quote using the supplier’s selling unit and minimum load size.
From the field
From Dr. Hassan Khames Eliwa's project controls experience
I've seen gravel ordered short more than once because someone multiplied the finished, compacted layer by a loose density and stopped there. Here it is with simplified numbers so the steps are easy to follow. A base 20 m by 5 m needs a compacted layer 15 cm deep. Geometric volume: 15.00 m³. Enter those dimensions with the gravel preset and you get 24.00 metric tonnes. That figure applies a loose bulk density to finished space. It isn't an order yet.
For this example, take a supplier's planning factor of 1.20 loose-to-compacted: each cubic metre of finished layer needs 1.20 m³ delivered loose. That's an assumption for the scenario, not a universal gravel factor. Worked separately, 15 × 1.20 = 18.00 m³ loose, 3.00 m³ more. At a confirmed loose density of 1,600 kg/m³, the delivery is 28.80 metric tonnes, 4.80 tonnes above the unadjusted figure.
The calculator has no compaction-factor field, so I check it this way: keep length 20 m and width 5 m, enter an equivalent loose depth of 18 cm, and set density override 1600. It reports 18.00 m³ and 28.80 tonnes. That 18 cm is bookkeeping, not a lift thickness; placement, moisture and lifts still follow the specification and trials.
My rule now: the drawing keeps the finished 15 cm, the order is labelled as loose quantity, and nobody adds the compaction factor a second time at checkout.
Field quick reference
| Quantity basis | Volume, m³ | Metric tonnes |
|---|---|---|
| Finished geometry with loose density | 15.00 | 24.00 |
| Adjusted loose delivery | 18.00 | 28.80 |
Expert tips
Common mistakes
- Entering 100 as a metric depth when you mean 100 mm gives a layer one metre deep. Convert 100 mm to 10 cm for this form.
- Confusing tonnes with US tons understates or overstates an order. Confirm the unit shown on the supplier’s quote, especially when comparing suppliers across countries.
- Using the density of solid rock ignores air spaces in a bulk load. Obtain loose bulk density or a stated volume-per-tonne yield instead.
Frequently asked questions
Does this include compaction?
No. It calculates the stated geometric volume at the chosen density. Confirm a loose-to-compacted allowance with the supplier or project specification before ordering for a compacted base.
Can I estimate sand with this tool?
Yes. Select sand, but treat the preset density as a starting point. Moisture and grading can substantially change the mass of a given bulk volume.
Is a US ton the same as a tonne?
No. A metric tonne is 1,000 kg. A US short ton is 2,000 pounds, exactly 907.18474 kg. A UK long ton is another unit and is not shown here.
Why does the volume stay unchanged when material changes?
The dimensions define the volume. Material selection changes the assumed density and therefore estimated mass, not the space occupied by the specified bed.
Should I round the order upward?
Discuss the calculated amount with the supplier. Their load increments, minimum order and expected site losses determine practical rounding. The calculator does not automatically add a contingency or convert the estimate into truckloads.
Related calculators
Related guides
Construction & ProjectHow to order concrete without running short or overpayingA field-focused guide to concrete quantities, thickness checks, sensible allowances and the delivery details that prevent expensive surprises.14 November 2026 · 7 min read
Construction & ProjectThree-point estimating: when PERT beats a single guessA practical guide to three-point duration estimates, weighted averages and the limits of turning uncertain activities into a promised date.14 November 2026 · 7 min readSources and standards
About the author
Dr. Hassan Khames Eliwa holds a PhD in Construction & Built Environment and has more than 20 years of international project controls experience. He is Director of Eliwa Project Controls Limited in Auckland and founder of PMMilestone.org and PMMilestone.com.
Buy me a coffee