This concrete calculator converts slab, footing, column or stair dimensions into cubic metres and yards with an ordering allowance. Bag estimates use mixed yields, not dry weight.
By Dr. Hassan Khames EliwaLast updated
Result
- Net volume
- 2.000 m³
- Cubic yards including waste
- 2.877 yd³
- 25 kg bagsAssumes 0.011 m³ per bag; verify product yield.
- 200
- 60 lb bagsAssumes 0.45 ft³ per bag.
- 173
- 80 lb bagsAssumes 0.60 ft³ per bag.
- 130
- Net2.00
- With waste2.20
How it works
Measure the actual concrete shape
For a slab or rectangular footing, volume is length × width × depth. For a round column, volume is π × diameter² × height ÷ 4. Quantity multiplies identical elements. Footings here are rectangular, not stepped or tapered.
Use metres and millimetres in metric mode, feet and inches in imperial mode, as labelled. Switching systems does not convert entries.
Stairs: define the takeoff boundaries
The stair option assumes equal rise/run modules over a straight waist slab. Each module contributes a triangular wedge of rise × run ÷ 2, multiplied by stair width. The waist contributes width × sloping length × thickness, where sloping length is the module count × √(rise² + run²). Waist thickness is measured perpendicular to the slope, not vertically; using vertical depth here overstates that part of the takeoff.
A landing adds length × stair width × landing thickness. Enter zero landing length to omit it. Count the full rise/run modules in this model, then check end details and overlaps against the approved section. This method does not represent solid-filled stairs, curved flights, tapered treads, stringer beams or multiple overlapping landings.
Add an ordering allowance
The calculator first converts dimensions to metres and calculates net geometric volume. It then multiplies by 1 + waste ÷ 100. The default 10% is an adjustable planning allowance, not an ACI requirement. Uneven excavation, form movement, pump priming and small spills can all increase consumption.
One cubic yard equals 0.764554857984 m³. Both displayed ordering volumes include the same allowance; do not add waste again when calling the supplier. Calculations retain full precision until display, and the tool does not round ready-mix volume to a supplier's dispatch increment.
Convert wet volume to bags
The bag estimates divide the allowance-adjusted volume by an assumed mixed yield and round upward. Assumptions are 0.011 m³ for a 25 kg bag, 0.45 ft³ for a 60 lb bag and 0.60 ft³ for an 80 lb bag. These are three alternative purchasing options, not quantities to add together.
Use the approved mix specification and bag label; geometry does not select strength, reinforcement or exposure class.
Worked example
A 5 m by 4 m patio
Choose slab, metric units, length 5 m, width 4 m, depth 100 mm, one element and 10% waste. Depth converts to 0.1 m, so the net volume is 5 × 4 × 0.1 = 2.000 m³. The allowance adds 0.200 m³, giving 2.200 m³, or 2.877 yd³.
Using the stated yields, that order volume requires 200 bags of 25 kg, 173 bags of 60 lb, or 130 bags of 80 lb. These bag sizes are alternatives. Compare ready-mix delivery with bag-mixing labour and confirm supplier order increments.
A straight stair flight and landing
Choose stairs, metric units, ten modules, rise 180 mm, run 280 mm, width 1 m and a 150 mm waist. Add a 1 m landing with 150 mm thickness and retain one element with 10% waste. The triangular wedges contain 10 × 0.18 × 0.28 ÷ 2 × 1 = 0.252 m³. The sloping waist length is 3.328663 m, so its volume is approximately 0.499299 m³. The landing adds 0.150 m³. The display gives 0.901 m³ net, 0.991 m³ including waste, and 1.297 yd³.
The same yields give 91 alternative 25 kg bags, using unrounded volume. Confirm landing boundaries to avoid double counting; this is not a structural or code check.
From the field
A crew is preparing a 12 m by 8 m slab specified at 150 mm. The theoretical takeoff is 14.400 m³, but a level check shows the subgrade averages 6 mm low. If the finished level stays fixed, that adds 0.576 m³ before any placing losses. The effective average depth is now 156 mm, giving 14.976 m³ net.
Enter slab, metric units, length 12, width 8, depth 156, quantity one and waste 5%. The allowance-adjusted volume is 15.725 m³ on screen, calculated from 15.7248 m³ before rounding. That 5% is an illustrative choice for a checked base and controlled pour, not a universal recommendation. Supplier dispatch increments still need checking.
If the order follows the drawing thickness alone, the crew risks reaching the last bay short. A replacement delivery may arrive too late to maintain the planned continuous pour, creating a cold-joint risk. Check the base, dispatch allowance and pour sequence before placing, rather than trying to stretch the concrete at the end.
Field quick reference
| Slab takeoff basis | Volume, m³ |
|---|---|
| Drawing thickness | 14.400 |
| Measured average depth | 14.976 |
| With placing allowance | 15.725 |
Expert tips
Common mistakes
- Using the column radius in the diameter box reduces the calculated volume to one quarter of the intended amount. Measure across the full circular form.
- Treating cubic yards as cubic feet creates a factor-of-27 error. Confirm the supplier's ordering unit and repeat it aloud when placing an order.
- Subtracting reinforcement or small embedded items without an approved takeoff can understate the practical order. This calculator makes no automatic deductions.
- Adding extra water to stretch bag yield changes performance. Follow the manufacturer's mixing instructions; water is not a substitute for missing concrete.
Frequently asked questions
Does the waste percentage include shrinkage?
It is a purchasing allowance for practical losses and dimensional uncertainty, not a material shrinkage model. Do not use it to predict hardened dimensions or structural movement.
Can I calculate stairs?
Yes. Choose stairs and enter equal rise/run modules, width, waist thickness measured normal to the slope and an optional landing. It models triangular step wedges over a sloping waist, not solid-filled or curved stairs. Check end details and overlaps against the drawing.
Why are bag counts rounded upward?
Bags are sold whole, and a fraction of a bag cannot cover a shortfall unless material is already available. The calculation rounds after applying the allowance to total volume.
Is 10% waste always enough?
No. Excavation tolerances, delivery arrangements and site conditions differ. Use measured conditions and supplier advice rather than treating the default as a universal rule.
Can this size a structural footing?
No. It estimates material for dimensions you supply. Bearing capacity, frost depth, reinforcement and structural design require project-specific assessment.
Related calculators
Related guides
Construction & ProjectHow to order concrete without running short or overpayingA field-focused guide to concrete quantities, thickness checks, sensible allowances and the delivery details that prevent expensive surprises.14 November 2026 · 7 min read
Construction & ProjectThree-point estimating: when PERT beats a single guessA practical guide to three-point duration estimates, weighted averages and the limits of turning uncertain activities into a promised date.14 November 2026 · 7 min readSources and standards
About the author
Dr. Hassan Khames Eliwa holds a PhD in Construction & Built Environment and has more than 20 years of international project controls experience. He is Director of Eliwa Project Controls Limited in Auckland and founder of PMMilestone.org and PMMilestone.com.
Buy me a coffee