208 free calculators · 46 in-depth guides
Calculators that show their working.
Money, health, maths and — unusually — construction and project controls. Every tool states its formula, walks through a real example and names its sources.
All calculators A–Z →Scientific
Popular calculators
Age CalculatorEnter birth and comparison dates for calendar age, days lived and next birthday.BMI CalculatorEnter height and weight for adult BMI and its WHO reference category.Calorie CalculatorEnter body measurements, activity and goal for maintenance and adjusted daily calories.Compound Interest CalculatorEnter savings, deposits, rate and compounding frequency for future balance and growth.Concrete CalculatorEnter slab, column or stair dimensions for concrete volume, waste and bag counts.Earned Value CalculatorEnter BAC, PV, EV and AC for cost/schedule indices and completion forecasts.GST / VAT CalculatorEnter amount, tax rate and inclusive/exclusive mode for tax and net/gross prices.Loan CalculatorEnter principal, rate and months for fixed payments and a loan payoff schedule.Mortgage CalculatorEnter price, deposit, rate and term for monthly mortgage payments and interest.
Construction & Project Calculators
Our flagship category — built from 20+ years on site
Financial Calculators
Fitness & Health Calculators
Math Calculators
Other Calculators
Latest articles
All articles →
Construction & ProjectCost estimate classes: what Class 5 to 1 really promiseA practical guide to AACE estimate classes: accuracy ranges, a worked Class 4 to Class 3 example, range vs contingency, and where AI fits.30 November 2026 · 11 min read
Construction & ProjectConstruction cash flow forecast: how to find your peak funding needA worked example showing how payment lag, retention and an S-curve spend profile set a project's peak funding need, and how to reduce it.29 November 2026 · 11 min read
Construction & ProjectDCMA 14-point schedule assessment: a practical guideEach of the 14 DCMA schedule checks explained by a scheduler: thresholds, a worked example where CPLI looks perfect but BEI says otherwise, and how to fix what fails.28 November 2026 · 13 min read
Construction & ProjectHow to Calculate a Price Escalation Clause in 2026: Formula, Steel Example and Common MistakesA practical method for index-based price adjustment: choosing the index, base and adjustment months, thresholds, caps, composites and the mistakes behind most disputes.27 November 2026 · 12 min read
Construction & ProjectEquipment hourly cost: how to calculate it and when renting wins in 2026Build an honest machine rate from depreciation, capital, fuel, repairs and operator cost, then test it against rental with a breakeven-hours check.25 November 2026 · 12 min read
Construction & ProjectHow to Calculate Construction Cost Escalation in 2026: Midpoint, Cash Flow and Rate SelectionA practical method for escalating a base-date estimate: midpoint of construction, cash-flow phasing, rate sources, sensitivity, and common mistakes.18 November 2026 · 12 min readEditor's picks
Earned Value CalculatorEnter BAC, PV, EV and AC for cost/schedule indices and completion forecasts.Concrete CalculatorEnter slab, column or stair dimensions for concrete volume, waste and bag counts.Mortgage CalculatorEnter price, deposit, rate and term for monthly mortgage payments and interest.Calorie CalculatorEnter body measurements, activity and goal for maintenance and adjusted daily calories.Percentage CalculatorEnter percentages and base values for portions, percent change or percentage points.PERT CalculatorEnter optimistic, likely and pessimistic durations for PERT mean and uncertainty.
Who builds this
Dr. Hassan Khames Eliwa
PhD, project controls consultant, Auckland
How calculators are testedEach formula has automated tests, and the worked example on every page is checked against the calculator's own output before it's published.
Private by designCalculations run in your browser. Nothing you type into a calculator is sent to us or stored. Read our standards.