Articles & guides
Longer explanations behind the calculators: where the formulas come from, what the results mean and the mistakes worth avoiding.
MathWeighted averages: where simple averages misleadChoose weights that match the question, combine rates from their denominators, and avoid misleading averages of prices, speeds and percentages.16 November 2026 · 8 min read
Construction & ProjectResource histograms and levelling: spot the peak earlyBuild a resource histogram, distinguish levelling from smoothing, and test whether a flatter labour plan is genuinely deliverable.16 November 2026 · 8 min read
Construction & ProjectCrew size, man-hours and productivity: labour arithmeticConvert scope and production rates into labour-hours and crew sizes, then test utilization, whole-shift bookings and labour cost.16 November 2026 · 8 min read
Construction & ProjectCPI and SPI trends: read the direction, not just the numberRead period and cumulative CPI and SPI together, test the data behind changing trends, and turn earned-value signals into practical decisions.16 November 2026 · 8 min read
FinancialComparing two loan offers: when the lower rate losesCompare loan payments, upfront fees, full-term costs and early payoff balances so a lower interest rate does not disguise a worse offer.16 November 2026 · 8 min read
Fitness & HealthVO2 max and race predictions: what the formulas can and cannot tell youField-test estimates and race projections answer different questions. Learn which assumptions matter before turning either result into a target.15 November 2026 · 8 min read
MathSample size and confidence intervals without the jargonSeparate sample planning from interval estimation, and make the assumptions visible before reporting a margin of error.15 November 2026 · 8 min read
Construction & ProjectRoof pitch, rafters and slope: one triangle, three tradesOne labeled triangle connects roof pitch, percent grade, and rafter slope length, but a geometric answer is not a structural design or cutting list.15 November 2026 · 8 min read
Construction & ProjectReading an S-curve: planned, earned and actual on one chartA practical way to separate planned accomplishment, earned value and actual cost before interpreting the gaps.15 November 2026 · 8 min read