Paver Calculator
This paver calculator turns a measured paving area into a whole-paver order and geometric quantities for compacted base and bedding sand. Select metric or imperial before entering dimensions; the tool does not convert numbers already in the boxes when you switch systems.
By Dr. Hassan Khames EliwaLast updated
Result
- Compacted base volume
- 2.000 m³
- Bedding sand volume
- 0.600 m³
How it works
Measure the paved footprint first
Use the net horizontal area that will actually receive paving. Split an irregular patio into simple shapes and add their areas, deducting permanent planters or other unpaved openings. This calculator accepts area rather than assuming every site is a rectangle. Check that your measurement includes narrow returns and thresholds, because those details are easy to overlook when taking off from a sketch.
Calculate pavers separately from loose materials
Paver count equals area divided by one paver's face area, multiplied by one plus the waste percentage. The final count is rounded upward to a whole paver. In metric mode, area is square metres and paver dimensions are millimetres. In imperial mode, area is square feet and dimensions are inches. Use the manufacturer's coverage dimensions where available; nominal dimensions and joint allowances are not always interchangeable.
Base volume equals area multiplied by compacted base depth. Sand volume equals area multiplied by bedding depth. Metric results are cubic metres; imperial results are cubic yards. These are geometric layer quantities, not loose delivery volumes or tonnes. The waste percentage affects pavers only. It does not silently enlarge either layer, so you can discuss compaction, delivery increments and losses with the supplier without hiding those assumptions.
Keep quantity takeoff separate from pavement design
The depth boxes describe your selected build-up; they do not recommend a pavement section. Ground conditions, drainage, traffic and local specifications determine suitable layers. Read the CMHA installation guidance alongside the product instructions. For aggregate delivery planning, compare the gravel calculator, but obtain an appropriate density and loose-to-compacted allowance rather than assuming all aggregates behave alike.
Worked example
Example: metric patio
For 20 m², pavers measuring 200 mm by 100 mm cover 0.020 m² each. The net count is 1,000; adding 5% waste gives an order of 1,050 pavers. A 100 mm compacted base requires 2.000 m³, and a 30 mm bedding layer requires 0.600 m³. These are the default inputs and displayed quantities.
Example: imperial walkway
For 100 ft², a 12 in by 12 in paver covers 1 ft². With 10% waste, order 110 pavers. A 4 in base requires 1.235 yd³ after display rounding, and a 1 in sand layer requires 0.309 yd³. The internal calculations retain full precision before formatting the layer volumes.
Expert tips
Common mistakes
- Switching unit systems without replacing the dimensions. The labels change meaning, but the entered values are not an automatic conversion of the previous design.
- Adding paver waste to the base result a second time without a reason. Breakage allowance and aggregate compaction allowance describe different physical issues.
- Using the geometric base quantity as a structural design. A correct volume does not show that the thickness, subgrade or drainage arrangement is suitable.
Frequently asked questions
Does waste apply to sand?
No. Waste increases the paver count only. Sand and base are calculated from the entered area and depths; discuss any separate delivery allowance with your supplier and document it outside this takeoff.
Are joints included?
Not automatically. Enter dimensions representing the intended coverage module if the manufacturer supplies that information. Using bare face dimensions can slightly overstate the count where joints contribute meaningful coverage.
Can I enter zero depth?
Yes, either layer can have zero depth when it is outside the purchasing scope. This is a quantity feature, not confirmation that the layer can safely be omitted from construction.
Does it calculate tonnes?
No. Converting volume to mass requires a defensible material density and an understanding of whether that density refers to loose or compacted material. Obtain those details for the actual product.
Why round pavers upward?
A fractional paver count is not a complete purchasing quantity. Rounding upward avoids ordering less than the calculated allowance, although the supplier may require further rounding to complete packs.
Can it handle a driveway?
It can measure quantities for your chosen dimensions, but it does not establish load capacity. Have the pavement section, edge restraint and drainage checked against the vehicle use and local requirements.
Related calculators
Related guides
Construction & ProjectHow to order concrete without running short or overpayingA field-focused guide to concrete quantities, thickness checks, sensible allowances and the delivery details that prevent expensive surprises.14 November 2026 · 7 min read
MathPercentages people get wrong: change, difference and pointsThe denominator determines the answer. Learn to distinguish percentage change, symmetric difference and percentage-point movements.14 November 2026 · 7 min readSources and standards
About the author
Dr. Hassan Khames Eliwa holds a PhD in Construction & Built Environment and has more than 20 years of international project controls experience. He is Director of Eliwa Project Controls Limited in Auckland and founder of PMMilestone.org and PMMilestone.com.
Buy me a coffee