Labour Cost Calculator
This labour cost calculator combines regular pay, overtime premium, employer burden and fixed labour-related project charges. It reports fully loaded cost, gross wages, worker-hours and effective hourly cost using one consistent currency unit throughout.
By Dr. Hassan Khames EliwaLast updated
Result
- Gross wages
- 4,000.00 currency units
- Overtime premium
- 0.00 currency units
- Employer burden
- 800.00 currency units
- Worker-hours
- 160.00 hours
- Effective hourly cost
- 30.63 currency units/hour
How it works
Total hours include overtime
Enter the total hours worked by each worker per day, then identify how many of those hours receive overtime pay. Overtime is a subset of total hours, not extra hours added afterward. Worker count must be a positive whole number. Days can be fractional for a partial work period, provided the same daily pattern remains a reasonable representation. Different pay grades or shift arrangements should be estimated separately and combined outside this calculation.
Separate base wages from premium
Worker-hours equal workers × days × total daily hours. Base pay values every one of those hours at the ordinary hourly rate. Overtime premium adds workers × days × overtime hours × base rate × (multiplier − 1). Gross wages are base pay plus that premium. This method avoids paying the overtime hours twice at the full premium rate. A multiplier of 1.5 means time-and-a-half overall, not an additional 150% on top of base wages.
Load the agreed wage base
Employer burden is applied to all calculated gross wages, including overtime premium. Loaded cost then adds fixed project charges. Effective hourly cost divides that full amount by total worker-hours. This is an estimating convention, not a payroll engine: statutory contributions, union provisions, benefits and overtime thresholds may use different bases. All amounts are currency-neutral. Keep the same currency in hourly pay and fixed charges, and label it explicitly in your estimate export.
Worked example
Scenario 1: regular working week
Four workers attend five eight-hour days at 25 currency units per hour. There is no overtime, so 160.00 worker-hours produce 4,000.00 in gross wages. A 20% employer burden adds 800.00, and a fixed charge of 100 brings loaded labour cost to 4,900.00 currency units. Effective hourly cost is 30.63 after display rounding. The underlying division is 4,900 ÷ 160 = 30.625.
Scenario 2: overtime within a longer shift
Two workers attend three ten-hour days, including two overtime hours per worker each day. At base rate 20 and multiplier 1.5, total worker-hours are 60.00. Base pay is 1,200.00 and overtime premium is 120.00, giving gross wages of 1,320.00. A 25% burden adds 330.00. With a fixed charge of 50, loaded cost is 1,700.00 currency units. Total hours remain sixty, not seventy-two.
From the field
From Dr. Hassan Khames Eliwa's project controls experience
Overtime is the recovery lever I've seen pulled most often, and the one most often oversold. The numbers below are simplified, with no fixed charges, so you can see the attendance effect on its own. Picture a crew asked to claw back two weeks, which we'll treat as ten working days. Four workers, 25 currency units per hour, 20% burden. Eight-hour days with zero overtime cost 9,600.00 loaded: 320.00 worker-hours and 8,000.00 gross wages.
The proposal was ten-hour days, two of them overtime at 1.5×. Enter total hours 10 and overtime 2 (not total hours 8). You get 400.00 worker-hours, 11,000.00 gross wages and a 1,000.00 overtime premium. Burden adds 2,200.00, so loaded cost reaches 13,200.00. That's 3,600.00 above ordinary attendance. People tend to quote only the premium. It's the smaller number.
Then there's output. Long days don't deliver full productivity in the last hours, and I've watched it on the daily records. As a planning sensitivity, not a rule, assume the first eight hours stay normal and the extra two run at 75%. Worked separately: 4 × 10 × (8 + 2 × 0.75) = 380 normal-productivity-equivalent worker-hours. That's 60 more than baseline, an 18.75% gain against a 25% rise in attendance, and 20 equivalent hours short of perfect productivity. Loaded cost per equivalent productive hour is 13,200 ÷ 380 = 34.74, rounded. The calculator has no productivity field, so this sits outside it.
What I do now is put that smaller gain against the remaining work before anyone signs off on a two-week recovery.
Field quick reference
| Attendance plan | Worker-hours | Loaded cost |
|---|---|---|
| Ordinary shifts | 320.00 | 9,600.00 |
| Extended shifts | 400.00 | 13,200.00 |
Expert tips
Common mistakes
- Entering regular hours alone understates attendance when overtime is also worked. Total daily hours must already contain the overtime subset.
- Applying a second overtime multiplier to gross wages overprices the shift. The calculator has already included ordinary pay on all hours and added only the extra premium.
- Effective hourly cost is neither a billing rate nor a wage rate. It spreads burden and fixed charges over hours and excludes any separately planned profit or commercial markup.
Frequently asked questions
Is this a statutory payroll calculator?
No. It uses an explicit estimating formula and does not determine legal overtime eligibility, tax withholding, minimum wages or employer obligations in any jurisdiction.
What belongs in employer burden?
Include the wage-related employer costs you have chosen to estimate on gross wages. Check each item’s actual assessment base; some benefits or contributions may require separate treatment.
Can I use another currency?
Yes. The outputs use currency units rather than assuming a symbol. Enter pay and fixed charges in the same currency and identify that currency wherever the estimate is shared.
What if workers have different overtime patterns?
Calculate each distinct worker group or shift pattern separately. A single line assumes every worker has the same daily hours, overtime hours, base rate and multiplier.
Does this calculate labour productivity?
No. It prices the attendance hours supplied. Use the PERT calculator to explore duration uncertainty, then reconcile the planned staffing and hours with your production estimate.
Related calculators
Related guides
Construction & ProjectLearning curves in construction: averages vs unitsApply Wright cumulative-average learning curves, verify incremental unit effort, and translate repeatable work into duration and labour cost.15 November 2026 · 8 min read
Construction & ProjectThree-point estimating: when PERT beats a single guessA practical guide to three-point duration estimates, weighted averages and the limits of turning uncertain activities into a promised date.14 November 2026 · 7 min read
Construction & ProjectEarned value management in plain English: CPI, SPI and what to do about themTurn planned value, earned value and actual cost into useful decisions without confusing budget performance with cash flow or time.14 November 2026 · 7 min readAbout the author
Dr. Hassan Khames Eliwa holds a PhD in Construction & Built Environment and has more than 20 years of international project controls experience. He is Director of Eliwa Project Controls Limited in Auckland and founder of PMMilestone.org and PMMilestone.com.
Buy me a coffee